Commissioning steps of diesel generator set:

The first step is to add water to the tank. Turn off the drain valve first. Add clean drinking water or purified water to the tank mouth. Cover the tank head.

Second step, add oil. Choose CD-40 the Great Wall brand diesel oil. The oil is divided into summer and winter in two different seasons, different oil, in the process of oil to observe the vernier, until oil is added to the vernier scale soaked position, cover the oil cap, do not add, too much oil will cause oil drainage and oil burning phenomenon.

The third step, the machine oil and multistop to distinguish. In order to ensure that the machine's oil is clean, diesel oil should normally be deposited for 72 hours. Enter the oil position, do not plug into the bottom of the cylinder, so as not to attract dirty oil, plug the tubing.

The fourth step, pump diesel, first loosen the nut on the hand pump, hand shake the handle of the oil pump. Press and hold evenly until the oil enters the pump.

The fifth step is to let the air out. To loosen the bleeder screw of the high pressure oil pump, and then press the hand pump, you will see the oil and the bubbles overflow in the screw hole until you see all the oil is flowing out. Tighten the screws.

The sixth step is to start the motor. Distinguish the positive and negative poles of the motor and the positive and negative poles of the battery. This is the positive pole, and in the tail, this is the negative pole. Between two batteries should be series, can achieve the effect of 24V. When the positive pole of the motor is connected to the positive pole, do not allow the terminal to come into contact with the other connecting line. Then the motor negative pole must be secured so as not to cause the fire to break the line segment.

The seventh step, the air switch. Before starting the machine or machine does not enter the power supply state, switch should be in separate state, the lower end of a switch four terminals, the three is the three-phase FireWire, is connected to the power line, next is the independent zero line and the zero line and the power line contact is any lighting 220V. Do not use a generator rated power beyond 1/3.

The eighth step, instrument part. Ammeter, in use, accurately read the power size used. Voltmeter detects motor output voltage. Frequency meter, frequency table must reach 50Hz, is the basis for testing speed. Current and voltage change-over switch for detecting motor meter data. Oil pressure meter, test generator operation oil pressure, in full speed state should be not less than 0.2 atmospheric pressure, tachometer, speed should be located at 1500 revolutions per minute. Water temperature meter, in use, can not exceed 95 degrees, the oil temperature generally can not exceed 85 degrees.

The ninth step is to start. Turn on the ignition, press the button, release the car, run for 30 seconds, toggle the high and low speed switch, the machine slowly rise to high speed in idle, check all instrument readings. Under all normal conditions, the air switch is closed and the power supply is successful.

The tenth step, parking. Turn off the air switch first, then cut off the power supply. The diesel engine is switched from high speed to low speed, then the machine is idle for 3 to 5 minutes, then closed.